Flood Prevention Attempt Number 2!
Today, we attempted to block off the rain water spillage coming from the workshop. See the little movie of the “river” gushing out of their workshop area (river starts at…
A DIY Selfbuild by Stephen, Shaun & Daphne
Today, we attempted to block off the rain water spillage coming from the workshop. See the little movie of the “river” gushing out of their workshop area (river starts at…
We were driven in by a sudden rain shower! it was very heavy and we have already 8mm of rain in just the 20 minutes we had so far as…
This morning, we connected the conduit pipes and inspection tube down into the Number 4 Energy Module. Then we pushed in the remaining sand / soil from around the hole…
We carried on with the task of filling our Energy Modules with water. Today, we finished filling Number 2 and started on filling Number 4 modules. The water in Number…
Today, we put on the insulation panels around the number 4 Energy Module. We inserted at least 300 mm thick of insulating boards, more like 350mm to 380mm thick! We…
Also today, we started filling up the existing and completed Energy Modules (number 1 and Number 2) to make sure we don’t suffer from another incident of rainwater getting underneath…
Today, we dug out the bottom of the hole of the Number 4 Energy Module and inserted the two guide rails to scrape flat the bottom. We then washed the…
Oh My! The buried energy module, Number 3 – our largest one we have done so far, has risen!! The rain we had today, plus the little we had yesterday,…
Rain Stops Play! This afternoon, after lunch, we discovered (by sticking our heads out of the door!!) that it was raining quite hard but it got worse even in those…
This morning, we started on our “Number 4” Energy Module. It is our smallest one at “only” 2 meters by 1.5 meters for the water tank itself and the hole…