We finished off the 1st layer this morning and then started the 2nd layer around the back of the building (Bedroom 3 and just into Bedroom 2) before lunch. That was 28 blocks in that session.
Then this afternoon, we zoomed along Bedroom 2, Bedroom 1 and half way around the Great Room before we ran out of mortar, plonking down a further 40 concrete blocks!
That is a total of 68 blocks for the day – WOW!
Tomorrow, we hope to complete the 2nd layer, doing a further 70 or so blocks, which should be feasible judging by this afternoon’s speed!!