Day 4 of Setting in the DPM over Ground
Today, while we waited for the rain shower to clear up, we sliced up loads of strips of OSB left-over from our foundation shuttering, down to 100mm wide, and these will…
A DIY Selfbuild by Stephen, Shaun & Daphne
Today, while we waited for the rain shower to clear up, we sliced up loads of strips of OSB left-over from our foundation shuttering, down to 100mm wide, and these will…
Today, we finished off laying down the plastic sheeting over the ground. We completed the strip over the Entertainment Room and Bedroom 2 which was fairly difficult with the array…
We carried on with the task of laying the Damp Proof Membrane (DPM) plastic down on the ground inside our perimeter wall of our house. We now have completed and…
With an interrupted morning, we carried on with the laying out of the DPM plastic sheeting across the whole ground area of the building. We covered up the Great Room…
Today, we carried on with the preparation jobs to be done before the concrete Floor Slab is poured. We made a list of all the tasks that has to be…
Today, we tackled the task of digging and loosening all the various pipes and conduits that run from the Garage to the House, and get them all laid out to come up…
We finished off the task of installing all the temperature probes’ conduits, around the two biggest Energy Modules, namely the one stretching across from the Kitchen, through the Hall and…
We had a bit of spare time today after we had completed the job of installing the temperature probes conduits around the Energy Modules so we spent an hour measuring…
Today, we carried on with the installation of conduits for the Temperature Probes around all our Energy Modules, but after we made a new drilling tool using a steel 32mm…
This morning, we got on with clearing the sandy soil material away from the base of the Perimeter Wall around the house so we can collect and transport the Rainwater…