Fifth Row Completed and Sixth Row half Done!

Today, we finished off the 5th row and did as much of the 6th row we can do.
That is another 38 blocks used! This is a total of 289½ blocks we have laid
down these last couple of weeks!!

The next job is to mix up concrete to pour down into each of the hollow
columns.

Row-5-Done-and-6th-As-far-as-possible-2