Today was spent tightening the concrete screws on our Footplate on the External Wall. We had to make sure the screws went down and gripped firmly the timber plank into place. There was only 4 that didn’t do a proper job so we re-drilled new holes alongside and this time, successfully tightened very nicely.
Then, it was the tidy up job of sweeping the leaves and rubble that has collected inside the footprint of the house bounded by the external wall and also knock off blobs of mortar and concrete off the walls and floor. We got a third of the way around the perimeter, collecting up enough to make a bag of rubbish.