Starting really early this morning, at round 8:30am, to avoid the incoming thunderstorm front, we went outside to have a go at installing our latest created rafter, this time, the O Ridge that has the 45degrees angled sloping down beam.
But unfortunately, even though it wasn’t raining at this time, and we even had sunshine out too, the rafter was still very damp from yesterday’s bad weather so we had to postpone the operation to another day when it is dry.
All we did was to move the two scaffolding towers around and positioned them into the approximate positions and then turned the O Ridge rafter upwards to allow it to drain and dry off easier when the rain comes. We sandwiched the rafter between the two towers to make sure it didn’t tip over.