Levelling and Tidying up ground around garage

Spent yesterday and today levelling and tidying up the grounds in front of the garage and the storage shed to get them ready for laying down an asphalt hard-core layer of around 100mm thick to produce a water resistant surface.

This will reduce the muddy conditions for both boots and tyres especially some of our more heavy deliveries!

We will cut a temporary trench across from the shed and half way towards the Loke and fill it with clean stones to act as the soak-away for the new surface to drain into. On top we will lay a line of paving slabs that we have lying around to provide a friendly path for visitors to our “new” front door when we move into the temporary accommodations !

The new surface will provide a firm and clean ground to store our timber and sheet wood long term as they arrive and needed for the build.