Leach Field Review
A quick review of our construction of the Leach Field. The video contains all 12 days of our work speeded up by over 300 times normal (one picture every 30…
A DIY Selfbuild by Stephen, Shaun & Daphne
A quick review of our construction of the Leach Field. The video contains all 12 days of our work speeded up by over 300 times normal (one picture every 30…
Day 1 and Day 2 of the Installation of our Sewage Processor! Saturday Day 1 Finished off compacting the soil over the Leach field. The Sewage Processor’s location is calculated…
The work continues .. .. Day 7 – Friday Finished off the sand layer to required depth (700mm). Marked out the trench lines ready for the 40mm stones. Day 8…
Dave our Building Control Officer came today to inspect our Leach field and the pipes. He said “OK” and that was that! Painless! So Far! He asked to see the…
We have been busy for the last week… On Friday we set out the trench lines for the leach field. Day 1 – Saturday Marked out and dug the first…
We cut the drainage slots into our standard sewage pipes with a circular saw. We also did a trial layout of leach field.
The last 10m of the loke has been used as dumping ground for soil, rubble and junk for many years. A few years ago our neighbor cleared a section by…
Now the hedge is gone we needed a barrier against accidents by passers by. So we pounded in a set of posts and topped them with a rail. The red…
We used the digger to pull out most of the Hedge from the Old Garage to the Front path along Smiths Loke. This will give us better access to the site and allow…
Removed the concrete base of the old garage. Started by using demolition hammer then decided to try using the mini digger. The mini digger wouldn’t start! The battery had gone…