Skip to content
  • Fri. Aug 15th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Earth Tubes Groundworks Phase 3

Adjusting Earth Tubes Chamber

May 5, 2016 Shaun

Today, while we waited for the building control inspector to visit us, we got on with making adjustments to the Earth Tube Mixing Chamber. We had originally constructed it several…

Build Progress Building Control Groundworks Phase 3 Sewage

Approval from Inspector!

May 5, 2016 Shaun

This afternoon, our building control inspector, Ken, came along and look at our sewage lines. He went around asking questions about what that line is for and what this sewage…

Phase 3 Repair

Rebuilt the Boundary Fence with Workshop

May 4, 2016 Shaun

And this afternoon, while we were waiting for the building inspector to come to look at our sewage pipes, we rebuilt the boundary fence, between us and the workshop. We…

Build Progress Groundworks Phase 3 Sewage

Third Pipe Run all Finished!

May 4, 2016 Shaun

Today, in the morning, we finished off the 3rd and final pipe run. We bedded it down with the gravel and used the laser level machine to determine and make…

Build Progress Groundworks Phase 3 Sewage

Second Line Completed and Third almost Finished too!

May 3, 2016 Shaun

Today, in glorious sunshine for most of the day, we completed the 2nd line of sewage pipes and got it bedded down in gravel before any further possible collapses of…

Build Progress Groundworks Phase 3 Sewage

Dug out Pipe 2 Trench

May 2, 2016 Stephen

We have dug out the trench for the second sewer pipe today. We dug most of it by hand as it was shallow and easy to dig. We stopped when…

Build Progress Groundworks Phase 3 Sewage

Second Sewage Line Started

Apr 30, 2016 Shaun

Today, we started the more difficult sewage pipeline, the one that is running across our driveway. It was tight to get the mini-digger in pass the garden shed, the air…

Build Progress Insulation Phase 3

Insulation Panels Arrive!

Apr 28, 2016 Shaun

Our order of ?seconds? of PU (polyurethane) insulation panels arrived today! It came on 14 pallets on a long lorry that managed to drive backwards down our Loke! They were…

Build Progress Groundworks Phase 3 Sewage

First Pipe Laid!

Apr 27, 2016 Shaun

Today, we did the 1st of three sewage pipes that needs to be laid in and under the house, before we put in the foundations and floor slab. This was…

Build Progress Groundworks Phase 3 Sewage

Double Check Calculations of Sewage pipe Positions

Apr 22, 2016 Shaun

This afternoon, we spent the time going over the drawings, calculating the exact positions of the sewage pipes coming out the ground (and through the concrete slab). We also discovered…

Posts pagination

1 … 100 101 102 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed