Blog

  • First Twenty Crates Washed!

    This morning, we got the first 20 Aquacell crates opened up, blasted with
    jets of water and reassembled back together again!

    We made a small dent in the pile of our Aquacell mountain ..

    Stack-of-Aquacells

    Stack-of-Aquacells

    Only another 180 crates to go!!

    We used our crate splitter tool, then used the pressure washer to spray
    water into all the crevices and then loaded our trolley with the sparkling
    clean plastic crates afterwards.

    Washing-Area

    Washing-Area

    A very wet job it is too!

  • Jigsaw Air Tunnel all Mortared Together!

    During a long session, starting this morning at 10am, we assembled and
    mortared all the pieces of the air tunnel together and finished about 2:30pm
    with the lids going on!

    We needed to mix two loads of mortar as we just ran out at the point of
    having done the two rows of the walls. So all the remaining mortar, after
    finished cementing down the concrete blocks on as lids, we spread it out all over the
    whole Earth Tube Mixing Chamber and down the slope of the air tunnel to seal
    and cover up the joints.

    Earth-Tube-Tunell-Mortered-Together-2

    Earth-Tube-Tunell-Mortered-Together-2

    Earth-Tube-Tunell-Mortered-Together-1

    Earth-Tube-Tunell-Mortered-Together-1


    We will now let that all set for a couple of days to harden, then start
    chucking in all the remaining hardcore and sandy soil around the area to
    build up the levels again, ready for the foundation!

    In the meantime, we start doing the Energy Modules!!

  • Air Tunnel ‘Jigsaw’ Pieces Cut!

    Today, it was the day of slicing many concrete blocks to create the air
    tunnel from the Earth Tubes Mixing Chamber to the house! The jigsaw puzzle
    was very complex with a three dimensional aspect to it, both sloping
    downwards, curving around and also widening out too!!

    There was at least 17 cuts made, using a 9inch diamond disc in a high
    powered angle grinder machine.

    Erth-tube-tunnel-blocks-cut-to-fit-1

    Erth-tube-tunnel-blocks-cut-to-fit-1

    Erth-tube-tunnel-blocks-cut-to-fit-2

    Erth-tube-tunnel-blocks-cut-to-fit-2

    Erth-tube-tunnel-blocks-cut-to-fit-3

    Erth-tube-tunnel-blocks-cut-to-fit-3


    We need to go and buy two more concrete blocks to complete the “lid” to the
    tunnel. That’s tomorrow’s job along with mortaring all the pieces together
    into one smooth solid unit!

  • New Tool to Split apart the Aquacell Crates

    This afternoon, while we waited for the black metal paint to dry on the wheel
    hub, we made a new tool to help us take apart the plastic holey crates, so
    we can clean them out!! You might ask why we are having to do this task?
    Well, several years ago, we took advantage of the cheaper oil prices and
    hence the prices of these plastic crates called Aquacell. We bought 200 of
    them and stored them around and behind our temporary living quarters. The
    problem has been caused by overgrowing ivy and other trailing plants from
    the neighbour’s garden, plus also we might find lots of slugs and snails
    living inside these dark spacious rectangular boxes (each measures 1000mm
    long by 500mm wide and just about 400mm high) and generally have dust and
    dirt blown into them over the years!!

    So we design this new tool to lever apart the two layers of the crate.

    Aquacell-Disassembly-Bottom-holding-studs

    Aquacell-Disassembly-Bottom-holding-studs

    Fortunately, they are just held together by friction and so we just
    constructed two vertical walls with metal rods sticking out at the bottom
    for the Aquacell to hook onto and then, in tandem, using steel rods, to hook
    into holes at the top of the crate and lever them apart. Quite easy as it
    turned out – thank goodness!

    Aquacell-Disassembly-Insert-Levers-and-lift

    Aquacell-Disassembly-Insert-Levers-and-lift

    Aquacell-Disassembly-Separated

    Aquacell-Disassembly-Separated


    We will get our pressure washer out and blast the interior clean of the dust
    and dirt, as well as the ivy and slugs too!!

  • Wheel on Trolley Fixed and Resprayed!

    This morning, on this lovely Sunday morning, we did some maintenance tasks,
    like for example, repair the puncture we got in one of the tyres of the
    large flatbed trolley.

    Large-Trolley-Old-Tyre

    Large-Trolley-Old-Tyre

    It was a devil to get the tyre off the metal wheel rim, but after surfing
    the net, we wiggled and heaved and levered the tyre off and pulled out the
    inner tube. The little hole in the inner tube was located and patched up.
    The tyre itself was thrown away as the rubber has cracked under the pressure
    of heavy loads we had on the trolley over the years, and this was what
    caused the puncture where the inner tube was “bursting” out!!

    We also gave the whole metal wheel a thorough rub with an angle grinder with
    the wire brush attachment and now is drying in the lovely sunshine with a
    fresh coat of black metal paint!!

    Large-Trolley-New-Tyre

    Large-Trolley-New-Tyre

    One done and three to go! But first, we will order some spare inner tubes,
    just in case we mess one up trying to get the tyre off etc.

  • The End of the Loke is now Clear of rubble and Gravel!

    As part of our commitment, with our neighbours, to keep the Loke neat and
    tidy, we scooped up the remaining hardcore and ballast gravel and sharp sand
    mixture and moved them off the end of the Loke and down into our building
    area. We scraped and levelled the surface and compacted it all over to make
    it nice and neat.

    End-of-loke-cleared

    End-of-loke-cleared

    We can at last get our old car out again!!

  • Air Tunnel Construction Started!

    After we have finished the sewage pipes (the filling in of their trenches),
    we started with the adjustment to the Earth Tube Mixing Chamber and the Air
    Supply Tunnel construction.

    The foundation slab is all set and very nicely done!

    Earth-tube-Concrete-finished

    Earth-tube-Concrete-finished

    We managed to get the end segment off the chamber with only having to
    destroy one of the concrete blocks. Now we are planning the procedure of
    what blocks to go where and what angles to slice certain blocks to form the
    downward slope of the tunnel exiting from the mixing chamber etc. etc.

    On Monday, we will resume and finish this task and then fill in all the soil
    and the remaining hardcore material back in around the chamber and tunnel
    and compact it all to build it up to the required level for the main house’s
    foundation etc.

  • All Trenches Filled!

    Today, again with marvellous weather, we finished filling in the trenches
    that has the sewage pipelines in. The trench cutting across the driveway and
    footpath was carefully layered with regular compacting with our now fully
    working vibrator machine.

    Stephen-Compacting-Trench-1

    Stephen-Compacting-Trench-1

    We used some of the left-over hardcore material on the last 8 inches and
    finally topped with two to three inches of the recycled asphalt material.

    Driveway-restored

    Driveway-restored

    The driveway and footpath now looks as good as new again!

    The rest of the trenches were filled with the dugout sandy soil and
    compacted in layers as before, the only exception to this process, is the
    kitchen pipeline because it runs outside the footprint of the house and it
    can settle down over the year by itself!!

    Pipe-trenches-filled

    Pipe-trenches-filled

    All there is to show for this hidden vital groundwork, is the forest of 5
    sticking up sewage pipes!!

  • Started Filling in Trenches!

    This afternoon, we started putting all the dirt and soil back into all the
    trenches of our three sewage pipe runs. We began at the trench cutting
    across our driveway, so that area can be made safe again for us and
    visitors.

    But we hit a slight problem with the petrol engine driven vibrating machine,
    it wouldn’t run for any length and Stephen took it apart to clean out the
    tubes and pipes etc. It now runs nice and smoothly again!!

    Shaun was clearing the driveway of piles of dirt and also scraping a layer
    of soil off the surface where silt have accumulated over the last few years
    when we had a river of rain water washing down the Loke carrying dirt and
    silt from the area, and depositing it on Our driveway!!

    Tomorrow, we will get on with the filling process in earnest!

  • Air Tunnel Foundation Poured

    This morning, we mixed up 3 bags of cement and 18 buckets of ballast and
    poured the lot into the open area we had all stuttered and ready. This slab
    will form the base for building the tunnel from the Earth Tube Mixing
    Chamber to connect to the house, thus bringing in fresh air from under the
    garage via the collection of large 6inch diameter tubes!

    Earth-Tube-Tunnel-Concrete-laid

    Earth-Tube-Tunnel-Concrete-laid

    After lunch, we will smooth it off and cover with plastic sheeting to keep
    it moist against the hot Sun and dry weather we got at the moment.