Skip to content
  • Sat. Jul 12th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Phase 4 Roof

Ten Sheets Of Plywood Is Up On Roof!

Jul 4, 2018 Shaun

Today, we started in earnest in putting up the roof boards all over the roof! We started on the “A” section and proceeded to do ten sheets of plywood (12mm…

Build Progress Phase 4 Roof

Preparation and Designing Work Flow Procedures to Start Covering the Roof with Plywood Boards

Jul 3, 2018 Shaun

This afternoon, we prepared the tools and equipment, like rolling the mobile scaffolding platform back to the beginning of the “A” section of the roof. Plus also get the compressed…

Build Progress Fascia Phase 4

Last Three Downpipe Channels Permanently Installed

Jul 3, 2018 Shaun

Today, we finished off doing the last three Downpipe Channels and permanently fitted into place with glue and screws. These were along the back of the building, on IJ, LM…

Build Progress Fascia Phase 4

Final Fascia Boards Done With Slot Plus Two More Downpipe Channels Fully Installed

Jul 2, 2018 Shaun

We resumed the task of cutting the slot into the Fascia boards, the final stretch going from “E” to “H” sections to complete the full circuit. We also fully installed…

Equipment and Tools Garage Garden

Toilet in Garage Serviced, and Also Garden Shredder Fitted With New Replacement Cutting Shoe

Jul 1, 2018 Shaun

Today, for this hot Sunday. We tackled a long overdue job of servicing the toilet in the back of the Garage. There was an overflow problem and it seems to…

Build Progress Fascia Phase 4

Working Along the Front ..

Jun 30, 2018 Shaun

For the last day of June, we had a long day of work, continuing the task of cutting the slot into the Fascia boards, this time, along the front. We…

Build Progress Fascia Phase 4

Corner Template Created and Tried & Tested plus Started Cutting Slot in Remaining Fascia Boards

Jun 28, 2018 Shaun

This afternoon, we created another template to help us with the task of cutting slots into the Fascia boards, this time, for the outside corners. These 45 degrees corners are…

Equipment and Tools

Four New Adjustable Feet Created for Scaffolding Tower’s Wheels

Jun 28, 2018 Shaun

This morning, the various steel parts were welded together to form four new adjustable feet, much stronger than before. We can now have confident that our mobile scaffolding will support…

Equipment and Tools

Scaffolding Tower Gets New Adjustable Wheels

Jun 27, 2018 Shaun

This afternoon, we needed to replace the threaded rod that are currently employed on our mobile scaffolding tower to allow for adjustment for each wheels to balance and stabilised the…

Repair Site

Courier Driver Comes to Apologise and Provides New Wooden Post

Jun 27, 2018 Shaun

At lunch time today, we had a visit from an unexpected person, the courier driver from UK Mail that had caused the damage to our Fence (see Fence broken by…

Posts pagination

1 … 39 40 41 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed