Skip to content
  • Fri. Jan 16th, 2026

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Groundworks Phase 3 Walls

Final Preparations Towards Building Perimeter Wall

Aug 20, 2016 Shaun

 Today, we finished off the preparation work of moving the remaining 300 concrete blocks, well actually more like 250 blocks as we still got a an untouched palette load of…

Build Progress Groundworks Phase 3 Walls

Preparing for Building Perimeter Wall

Aug 18, 2016 Shaun

 Today, in glorious summer weather, we went around all the foundations and filled in the gaps and drop-offs around the edges of the foundations to the surrounding soil, so we…

Build Progress Foundations Groundworks Phase 3

Tidy Up Day 2

Aug 17, 2016 Shaun

 We finished off the tidying up task by removing the last lengths of shuttering and putting all the loose pieces back under cover in our Timber Storage. The used pegs (which are…

Build Progress Foundations Groundworks Phase 3

Tidy Up After Concrete Poured!

Aug 16, 2016 Shaun

 Today, we started going around removing the shuttering boards and planks from the foundation strips. We also picked up the lumps of concrete that spilled over the edges and started the…

Build Progress Phase 3 Walls

Concrete Blocks Arrives

Aug 16, 2016 Shaun

Our order of 720 concrete hollow blocks arrived today, on 12 palettes. These 140mm wide blocks will form the four layers of the short perimeter wall to protect our house from…

Build Progress Foundations Groundworks Phase 3 Timelapse Movies

Foundation Concrete Is Poured!

Aug 15, 2016 Shaun

Here’s the site  at 7:46 before we got started … Our day started at 8:30 am with the arrival of the concrete pump lorry (half an hour early) .. The pump…

Build Progress Foundations Groundworks Phase 3

Preparations for Concrete Finished

Aug 13, 2016 Shaun

 We finished the preparation tasks, in readiness for the ready mixed concrete coming Monday. We went around all the trenches and making sure we can work alongside every stretch of…

Build Progress Foundations Groundworks Phase 3

Preparations Continues..

Aug 12, 2016 Shaun

 Today, we put together a series of tools for scraping and patting down the liquid concrete in the trenches. We have a range of different height of shuttering so each…

Build Progress Foundations Groundworks Phase 3

Consultation with Concrete Rep Changes Plans

Aug 10, 2016 Shaun

 Today, we started organising our new viaducts shoots so to be ready for the arrival of the ready mixed concrete, but discovered the “heavy” truth  of concrete and how it…

Build Progress Foundations Groundworks Phase 3

Concrete Mobile Channels Constructed

Aug 8, 2016 Shaun

 Today, in the lovely sunny weather we are still having here, we constructed a homemade mobile viaducts to help carry the ready mixed concrete from the lorry up on our…

Posts pagination

1 … 90 91 92 … 149

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed