Sewage Processor is up and running!
This posting is a record of the moment where the air pump was switched on and we had air bubbling through the water! Very Nice! It is now running continuously…
A DIY Selfbuild by Stephen, Shaun & Daphne
This posting is a record of the moment where the air pump was switched on and we had air bubbling through the water! Very Nice! It is now running continuously…
The work continues with the Sewage Processor installation and its connections! Day 3 – Tuesday 13th July Started with the concrete mixing to bed down the processor unit but didn’t…
As we blogged earlier the extension tube would not fit the top of the sewage processor. I rung the manufacturers (Conder) who said they would get back to me soon.…
It’s a Stoppage! The Extension Collar for the Sewage Processor does not fit! The collar is designed to slide over the ring moulded into the top of the tank but…
The final load of concrete is now in early this morning and after a couple of hours for it to set enough, we loaded 10mm gravel in around the sides.…
The new capacitor arrived (rather late in the afternoon !) and installed it in the cement mixer and it’s go go go! Or at least it will be tomorrow! Sharp!
Started mixing concrete and pouring round the base of the tank but we were stoppped by the mixer breaking down. Took it apart and found the motor start capacitor has…
Dave the BCO came and approved the sewage processor in situ.
After a month without daytime rain we can finally burn the pile of hedging pulled up on the 7th of June! In fact the rain stopped just long enough for…
A quick review of our construction of the Leach Field. The video contains all 12 days of our work speeded up by over 300 times normal (one picture every 30…