Fourth Row Progresses
We only did half a day of work today, so we did another 22 blocks on our 4th row of the back wall of the swimming lane. We had another…
A DIY Selfbuild by Stephen, Shaun & Daphne
We only did half a day of work today, so we did another 22 blocks on our 4th row of the back wall of the swimming lane. We had another…
The battery was successfully charged up using the mains charger overnight. But when we tested the solar charger, we discovered that there was only 4volts coming out! Oops! But after…
This morning, we finished off the 3rd row (7 more blocks), and then started on the 4th row. The end wall had another set of reinforcing bars placed horizontally and…
We did two loads of the cement mixer today, one bag of cement in total. This allowed us to do a further 39 blocks. 20 this morning and 19 this…
We suspect that there is a problem with the dumper truck’s battery or the charging circuit from the solar panel. We got only 3 starts out of the battery today…
We got the 2nd row done today before lunch, having started at 9am this morning. That was 21½ blocks put down. We split one of the concrete blocks in half,…
We did only a half day of work today, as we had other commitments in the morning. On Monday, we tried mixing the mortar with 4litres and 50ml of Plasticiser…
We have made a tool to speed up applying mortar to top of the block for the next row. This is slightly complicated in that there are only narrow rims…
Date:21/02/2016 18:33 We started building the back wall of the swimming lane today! We managed to do 43 blocks with 3 mixer loads of mortar before it got dark. Each…
We moved all the 120 concrete blocks over to the slab, spread out along the whole length (22.5metres), ready to build up 2 layers of the back wall, and the…