Today, before the thunderstorm arrived, we managed to move over the stack of
OSB sheets (we have 34 of them left) including the protective house covering
the wood. We also moved half the pile of the 63mm by 38mm CLS timber over to
its new location.

The picture below is the “Before” image of our timber yard just outside our
front door, we are going to move everything around to the new swimming lane
to store them there.

Storage-area-before-clearance

Storage-area-before-clearance

Blocks-ready-for-timber

Blocks-ready-for-timber


By Shaun

Leave a Reply