We resumed the work on the construction of the foundation trenches shuttering along the back section of the building. The ground in several places is very hard and one place looks like an old fire pit with dark coloured very hard material.

Foundation-Trenches-Day-2-1

Foundation-Trenches-Day-2-1

Foundation-Trenches-Day-2-2

Foundation-Trenches-Day-2-2

Foundation-Trenches-Day-2-3

Foundation-Trenches-Day-2-3

Foundation-Trenches-Day-2-4

Foundation-Trenches-Day-2-4


We should have this section done tomorrow and then we can work on doing the front to back strips.

By Shaun

Leave a Reply