Today, we finished off the shuttering for the back section of the building’s foundations.

We put the two layers of the 89mm Timber to form the necessary height to hold the 150mm thick foundation strip.

Part of the job was to dig out some parts of the shuttering where it got buried in our flood we had last week. Phew!

Tomorrow, we will work on the front to back foundation strips, using 300mm wide pieces of 18mm thick OSB sheets This will allow for us to push the concrete harder along these channels without it spilling over the sides.