Work Continues on Construction of First Floor and Its Floorboards
We resume the week by collecting up the sand we had spread across the kitchen to dry and sieved it through the finest mesh we had and lugged up six…
A DIY Selfbuild by Stephen, Shaun & Daphne
We resume the week by collecting up the sand we had spread across the kitchen to dry and sieved it through the finest mesh we had and lugged up six…
Stephen nearly fell through the floor today! He was walking across the unfinished floor to fit a piece of plumbing pipe when he stepped on the edge of a small…
This week was a chop and change kind of week, working on lots of different elements that needed to be done before we can continue in laying down the floorboards…
It is very very hot outside today, we had to repair the tarpaulin that provides a sun shield over our long corridor in our temporary living quarter and also replace…
We carried on with the task of cutting and hauling up a whole series of Joists to form our First Floor structure. We had started at the back of the…
Today, Tuesday the 8th of June, saw the arrival of two replacement triple glazing units, to swop out the defective windows. They had internal scratches between the layers of glass…
We carried on from last week in installing the joists for the First Floor. We glued and nailed the section over Bedroom 1 and then moved on to tackle the…