These last few days, we have been clearing and tidying up the left overs bits and pieces created from the formation of the Floor Slab a week ago. All the spillage of excess concrete around the outside of the Perimeter Wall is now all picked up and moved inside ready for collection. Also all the concrete blocks are loose and also ready for collection. The rain keeps coming and going and our Floor Slab has a constant thin layer of rainwater all over, which actually helps with the curing process so we are not in a hurry to drain the water away.
We also are doing other tasks too like sorting out the remainder of the roof’s rainwater guttering pipework, plus also the process of ordering the steelwork as well.