Our inspector from the building control department came at lunch time and inspected the integrity of our DPM, ready for the floor slab of the garage and as long as we carry on and mix high cement concrete and push it in and around all the conduits and pipes to seal the DPM down solidly, he is happy!
Well, that’s another box ticked !