Skip to content
  • Thu. Jan 15th, 2026

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Earth Tubes Groundworks Phase 3

Air Tunnel Finished – Part 2!

May 19, 2016 Shaun

This morning, we tied our pulling ropes to the 6 support struts and mortared the cement board down on top of the wooden T supports. We are letting it set…

Repair Temporary Accommodations

Minor Roof Repairs

May 18, 2016 Shaun

This morning, we installed our Sun Shield covering over the long corridor. While up there on the roof, we inspected, as we always do each year, the quality and state…

Build Progress Earth Tubes Groundworks Phase 3

Finishing off the Air Tunnel – Part 1

May 18, 2016 Shaun

Today, while we waited for the delivery of our 300metres of the 20mm black plastic pipe to come, we worked on finishing off the Earth Tube Mixing Chamber and the…

Build Progress Energy Modules Phase 3

Temperature Probes

May 14, 2016 Shaun

This afternoon, we looked at our requirement of installing temperature sensors around each Energy Module. But we don’t have the actual temperature probes or wires yet, so we need narrow…

Equipment and Tools Repair

Electric Vibrator Reassembled

May 14, 2016 Shaun

This morning, Stephen put back together the electric powered vibrating plate compactor, bolting the off-centre motor back onto the base plate. He also had to extend the cable back up…

Build Progress Energy Modules Groundworks Phase 3

Number 1 Energy Modules Installation Started

May 13, 2016 Shaun

It was our first hole to do (out of the total of 5!) and it is the 2nd smallest one to dig out! It lives under bedroom 3, half in…

Mini Digger Repair

Digger drips oil

May 13, 2016 Stephen

While digging the hole for the first energy module today, we noticed that there were splashes of oil on the digger’s tracks and the ground nearby. It looks like we…

Build Progress Equipment and Tools Phase 3

A new Boring Tool made

May 12, 2016 Shaun

This afternoon, we researched and designed a simple boring tool for making holes into the soil where we need to insert temperature sensors in and around the Energy Modules. We…

Aquacell Modules Build Progress Energy Modules Groundworks Phase 3

First Twenty Crates Washed!

May 12, 2016 Shaun

This morning, we got the first 20 Aquacell crates opened up, blasted with jets of water and reassembled back together again! We made a small dent in the pile of…

Build Progress Earth Tubes Groundworks Phase 3

Jigsaw Air Tunnel all Mortared Together!

May 11, 2016 Shaun

During a long session, starting this morning at 10am, we assembled and mortared all the pieces of the air tunnel together and finished about 2:30pm with the lids going on!…

Posts pagination

1 … 99 100 101 … 149

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed