Skip to content
  • Fri. Aug 15th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Phase 1

Complete!

Jan 28, 2012 Shaun

It might be safe now to admit that Phase 1 of our building project is Complete! At last! We have settled into our new temporary living quarters, sorting out a…

Build Progress Garage Phase 1

Electric Supply Moved!

Nov 21, 2011 Shaun

Today we had our electric supply moved from the old place to the new place! Our electrician came this morning at around 10am, to test and supply a certificate of…

Build Progress

We are all living in the Temporary Accomodation

Nov 18, 2011 Stephen

All three of us are now eating and sleeping in the new place. Sometime I thought it would never happen! There is still quite a lot of stuff still to…

Build Progress Phase 1 Temporary Accommodations

The Great Move commences

Nov 12, 2011 Shaun

We have started our move! A steady baggage train from the old place to the new place has been rumbling along, with us carrying boxes full of our personal bits…

Build Progress Garage Phase 1

Bits and Pieces #2

Nov 8, 2011 Shaun

Yesterday and today, we did further tidy ups of outstanding tasks. The chest freezer has been moved from the outside shed to the new kitchen. It was cleaned top to…

Build Progress Garage Phase 1

Miscellaneous Bits and Pieces

Nov 6, 2011 Shaun

For the last three days, we have been doing odds and ends of tasks which needs completing before we can move. The shower tray and the heat exchanger are coming…

Build Progress Phase 1 Temporary Accommodations

Bedroom Furniture Day 3

Nov 3, 2011 Shaun

Bedroom 2 got its new bed frame assembled. The bed frame was made up of 4 strips of 300mm wide by 2315mm long of the usual 18mm OSB material, sitting…

Build Progress Phase 1 Temporary Accommodations

Furniture for Bedrooms day 2

Nov 1, 2011 Shaun

Bedroom 3 has it computer worktable all assembled and varnished today this afternoon. []image caption=”true”] The red dye has worked quite well but also we drilled a series of holes…

Build Progress Phase 1

Electrician Came and Saw!

Nov 1, 2011 Shaun

The electrician we asked to come, arrived this morning, to see, to talk and check our electrics. It was a very informative visit, really appreciating his expert knowledge and advice.…

Build Progress Phase 1 Temporary Accommodations

Bedroom Furniture!

Oct 31, 2011 Shaun

We were today making some furniture for the bedrooms. In bedroom 3 will have a new computer work area and bedroom 2 will have a new bed base (replacing a…

Posts pagination

1 … 110 111 112 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed