Skip to content
  • Sat. Aug 16th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Garage Phase 1

Smoke Alarm circuit Design

Oct 6, 2011 Shaun

We analysed our building layout including our temporary living quarters and selected 4 devices, 1 optical smoke detector, 2 ionising smoke detectors and 1 heat sensor, all linked together as…

Build Progress Garage Phase 1

Kitchen & Hot Water

Oct 5, 2011 Shaun

The sink seems to be sealed! We ran water into the sink and nothing leaked!! The waste disposal unit operated just fine too! Phew! Thanks goodness for that! We switched…

Build Progress Phase 1 Temporary Accommodations

Shower Cubicle Bits and Pieces

Oct 4, 2011 Shaun

We put together a light box with two low energy bulbs in it, to provide plenty of light inside the shower! It was made of spare pieces of our fermacell…

Build Progress Garage Phase 1

Kitchen Sink installed

Oct 4, 2011 Shaun

Today the sink was installed into the new worktop. The waste disposal unit was attached underneath and the waste pipes sorted ready for the outputs of the washing machine and…

Build Progress Garage Phase 1

Kitchen Worktop Installed

Oct 3, 2011 Shaun

Today the final stretch of worktop with vertical panels underneath, to make the sections for the three machines (dishwasher, washing machine and tumble dryer – respectively from right to left),…

Build Progress Phase 1 Temporary Accommodations

Shower Cubicle Day 9

Oct 1, 2011 Shaun

We got back to finishing off the Shower cubicle today. We wired up a switched fuse electrical unit to allow us to isolate any of the equipment in and around…

Build Progress Garage Phase 1

Garden Room Network Enabled

Oct 1, 2011 Shaun

Today the Garden Room had three pieces of network cable threaded around in the Utility Rail, ready for activation when the ADSL router in moved (from the old house) and…

Build Progress Energy Phase 1

Heat Exchange module Trials and Conclusions

Sep 29, 2011 Shaun

The water test was performed on the heat exchanger module outside using the garden hose! The “maze” slowed down the water that it took well over a minute (nearer two)…

Build Progress Energy Phase 1

Heat Exchanger Stage 2

Sep 27, 2011 Shaun

Yesterday and today were spent on trying to get the copper pipes soldered to the copper sheet. But it was proving to be quite difficult with several factors playing against…

Build Progress Energy Phase 1

Heat Exchanger for Shower

Sep 25, 2011 Shaun

Today we cut the copper pipes (474mm long), 17 of them, along with 18little (24mm) pieces, each to connect the two right angle bends (36 of them!). The whole thing…

Posts pagination

1 … 114 115 116 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed