The 27 pieces of shelving for the Garden Room was finished being sanded smooth this morning. All were vacuumed to remove all the dust and first half painted before lunch.

Then after lunch, while the second batch was painted, the first was gently rubbed with fine sandpaper and the edges filled with caulk, ready for the full gloss coat tomorrow.


By Shaun

Leave a Reply