Skip to content
  • Mon. Aug 11th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Rain Stoppage Walls

Perimeter Wall interrupted by Rain!

Sep 3, 2016 Shaun

 After lunch, because of the rain forecasted to arrive about 4pm to 5pm which made block laying impractical we had to do something else. So we moved and tidied up…

Build Progress Groundworks Phase 3 Walls

Day 9 of Perimeter Wall Block by Block!

Sep 3, 2016 Shaun

We started early this morning to try and do as many concrete blocks on our 3rd tier of the Perimeter Wall before lunchtime and the predicted rain coming this afternoon.…

Build Progress Groundworks Phase 3 Walls

Day 8 of Perimeter Wall Heading Upwards!

Sep 1, 2016 Shaun

 We set a new record today of putting down 85 concrete blocks in two sessions! This morning, we carried on with the 2nd layer and completed the Great Room, the…

Build Progress Groundworks Phase 3 Walls

Day 7 of Perimeter Wall Construction, Layer by Layer

Aug 31, 2016 Shaun

 We finished off the 1st layer this morning and then started the 2nd layer around the back of the building (Bedroom 3 and just into Bedroom 2) before lunch. That…

Build Progress Groundworks Phase 3 Walls

Day 6 of Perimeter Wall Rising Out Of Ground!

Aug 30, 2016 Shaun

 Today we carried on doing the 1st layer of the blocks, filling in the straight portions between the corners. Even though we had a delayed start (due to a haircut…

Build Progress Groundworks Phase 3 Walls

Day 5 of Perimeter Wall Construction

Aug 29, 2016 Shaun

 Today, in a mixture of sunshine and clouds but no rain, we finished off the final 9½ corners to complete the 4 tiers we got designed for our Perimeter Wall,…

Rain

.. live from the field!

Aug 28, 2016 Shaun

 It was a pleasant day this Sunday .. until a huge dark cloud came slowly over at about 17:30 and dropped about 30mm of rain in an hour!! Wow Wee!!…

Build Progress Groundworks Phase 3 Walls

Day 4 – Perimeter Wall Corners Taking Shape!

Aug 27, 2016 Shaun

 Today, under a cloudy sky and swirling winds, we finished off the 3rd tier of concrete blocks, doing 12 corners to complete the loop around the building, each corner having…

Build Progress Groundworks Phase 3 Walls

Day 3 of Perimeter Block Wall Construction

Aug 26, 2016 Shaun

 We carried on with doing the 2nd course of concrete blocks, working around the 9 corners. We decided to split the mortar amount in half so that we could control…

Build Progress Groundworks Phase 3 Walls

Day 2 of Perimeter Wall Construction

Aug 24, 2016 Shaun

 In the morning we finished off the front 5 corners to complete the set of 14 corners our building has, and this allows us to get a consistent and accurate…

Posts pagination

1 … 88 89 90 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed