We have been laying the granulated asphalt down over the last 2 days. On Thursday we laid an area in front of the garage which has a slope towards the sheds. We started Friday by digging a trench from the front door past the sewage tank and to the loke, the trench was filled with small stones to provide drainage. We then laid the last part in front of the garage and the next section towards the loke. It started raining as we finished so it will be interesting to see how the surface performs.