Today we had our electric supply moved from the old place to the new place!

Our electrician came this morning at around 10am, to test and supply a certificate of worthiness. The EDF people came about 11:30am (two of them) and did everything in one hour! They dug a hole down to the old steel wrapped twin core cable, moved the old meter, hacksawed and sliced into the old cable and threaded the new aluminium 6mm diameter with 25 thin copper wires woven mesh outer covering through the conduit into the garage.

We now have a 100amp fuse but still our old meter. We will order a new one! Hopefully it will be a smart one!


The electrician finished testing and connecting the consumer unit to the new supply. We are back up and running!