We managed to finish off the front line of trenches, going around the complex air tunnel and chimney section, and continued along the final long side, F6 to B6 front to back trench.

Foundation-Trenches-Day-9-1

Foundation-Trenches-Day-9-1

Foundation-Trenches-Day-9

Foundation-Trenches-Day-9


Just need to do the other side of the side trench and then the Entertainment room box and the 2 individual pads and that’s it!