We finished off the installation of the pipes (running around the whole perimeter of the house) that [will] collect the rain water off the roof.

End-of-Rainwater-ring

End-of-Rainwater-ring

The last stretch is along behind Bedroom 2 and in the corner with Bedroom 3 and towards the end of the Swimming Lane. We put in the 8th and final down pipe spur in that corner of the building and it is now all finished, ready for the Filtration Module which will sit at the end of the swimming lane, we will assemble it later on when we have the roof constructed.

By Shaun