The Twelve Corner Posts Creation Continues
Today, we took all our sawn up lengths of the 89mm CLS timber, and marked them up to make sure we had the correct end as the top of the…
A DIY Selfbuild by Stephen, Shaun & Daphne
Today, we took all our sawn up lengths of the 89mm CLS timber, and marked them up to make sure we had the correct end as the top of the…
These last two days has been time spent on adding a vacuum system to the modular Workbench unit. Using rigid plastic pipes and right angled corners plus a Y junction,…
It was another day of working in the Workshop while the cold rainy weather front slowly drifted down from the North. Today, we created the Parts that will make the…
Today, we carried on making our Legs that will create our External Wall of the house. We got the glue dispenser going, connected up the nail gun and started loading…
Since there was a big threat of rain arriving in the early afternoon, we changed our planned task for the day and instead went into more Factory Production mode to…
Just dashed outside this evening to quickly (an hour’s work) treat all our cuts ends and slots with chemical Preservative to make sure that no rot will occur in the…
This morning, we resumed the production line of the Legs for our Great Room. we made another 25 Legs to add to the 7 we did yesterday, making a total…
Today, we spent the time slicing and chopping lots of materials for the creation of the Legs for our Great Room. After carefully checking yesterday our Leg Element and how…
Today saw the start of the creation of the External Wall Legs. These legs forms the main structural load bearing elements for both the roof (on the outer leg) and…
This morning, we had the Septic Tank serviced and emptied. We then gave it a once over, cleaning the various inlet and outlet pipes to make sure they were all…