Skip to content
  • Fri. Feb 20th, 2026

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Ground Floor Phase 5 Walls

Ground Floor Walls Structure All Finished

May 1, 2021 Shaun

We continued the task of putting up reinforced wall posts for the hanging toilets for the cloakroom and for the en-suite of Bedroom 3 where we had to put down…

Build Progress Orders and Procurement Phase 5

First Floor Joist I-Beams Quantified and Ordered

Apr 30, 2021 Shaun

After a week of calculating, analysing responses and digesting options, we have finally placed an order for a collection of Joist Beams to build our First Floor support. There are…

Build Progress Ground Floor Phase 5 Walls

All the CLS Planks Moved Indoors and Ground Floor Walls Is Going Up

Apr 24, 2021 Shaun

We have resumed our task of building up the Ground Floor’s walls, at least, the structural framework structure using our 63mm CLS timber planks and over the last eight days…

Build Progress Phase 5 Utility Room

Rebuilt the Utility Room and Its Shelves

Apr 15, 2021 Shaun

Whilst tidying up the house of the insulation foam rubbish, a new set of shelves was created to provide more room for tools and parts to be on hand for…

Build Progress Phase 5 Tidy Up

Massive Tidy Up of Mountains of PU Foam left-over Cut-Offs!

Apr 15, 2021 Shaun

In the course of filling our exterior walls with rigid foam boards, which get a huge “mountain” of left-over cut-offs pieces, some fairly regular in shape but many just simply…

Filtration Module Rainwater Repair

Rain Water Filter Module Upgraded With Stainless Steel Mesh

Apr 13, 2021 Shaun

We postponed the insertion of the PU foam board into the Great Room walls, because the freezing temperatures that has just arrived with the icy northerly weather, would not allow…

Build Progress The Loke

Artificial Grass Stitched Down Middle Of Loke

Apr 10, 2021 Shaun

Over the last couple of days, the two rolls of artificial grass we bought, which are left-over pieces from the supplier at half the normal prices. They were 4metre long…

Build Progress Phase 5 Walls

Exterior Walls All Fully Insulated with PU Foam Boards

Apr 8, 2021 Shaun

By Thursday, after a couple of delayed days due to icy cold weather that would have stopped the gun foam from working properly, we finally finished installing the 200mm (on…

Site Maintenance Tidy Up

Spare timber Store Moved Outside to Swimming Lane

Apr 4, 2021 Shaun

Today, we decided to move the heap of timber planks we had stored inside our Great Room, on a raised shelving rack system. The main reason for tackling this job…

Build Progress Ground Floor Phase 5 Utility Room

Utility Room reorganised and First Solid Wall built

Apr 1, 2021 Shaun

We needed access to the sections of the exterior walls in the utility room to get the insulation boards in, we are currently storing tools there. So today, Thursday, on…

Posts pagination

1 … 17 18 19 … 149

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed