Skip to content
  • Sun. Jul 20th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Phase 4 Rafters

Work Begins on “P” Section of Roof

Dec 19, 2017 Shaun

Today, after a fairly long delay where we were recovering from an injury but also doing the Oak timber Survey and Ordering, we resumed our task of creating more rafters…

Site Management

Oak Shelter Constructed

Dec 15, 2017 Shaun

These last few days has been spent working on our Oak Timber requirements and as a result of putting in quotes for more than 6 cubic metres of Oak, we…

Orders and Procurement Phase 4

External Oak Timber Survey

Dec 11, 2017 Shaun

The last few days, while Shaun recovers from a Back Muscles Twinge injury, we have been surveying for all the Oak timber we would need for the external features of…

Build Progress Phase 4 Rafters Timelapse Movies

“H” Rafters Fully Manufactured and Ready to be Installed

Dec 11, 2017 Shaun

On this very wet and chilly Monday, we resumed work in our nice and warm workshop to finish off the manufacturing processes on our set of rafters to do the…

Injury

Back Muscles Twinge!

Dec 10, 2017 Shaun

During the manufacturing of rafters on Thursday, 3 days ago, Shaun suffered a twinge in his lower back muscles and had to slow down. Fortunately, we had only one session…

Build Progress Phase 4 Rafters

The “H” Rafters All Manufactured!

Dec 7, 2017 Shaun

Today, we entered into the joyous task of assembling the 13 rafters that will see the completion of the “H” section of the roof (the right hand side of the…

Build Progress Phase 4 Rafters

“H” Section All Prepared and Ready for Manufacture

Dec 6, 2017 Shaun

These last two days has been the task of making various bits and pieces to continue manufacturing more rafters, the main task being slicing up a further 24 sheets of…

Site Maintenance

Roof on Storage Cover and Garden Shed Repaired

Dec 6, 2017 Shaun

This morning and yesterday, we did some maintenance work on our various structures, to repair leaks in the roof of the garden shed and the temporary plywood storage tent cover.…

Build Progress Phase 4 Rafters

Installed the Last Two Middle “H” Rafters and Measured Up The Next Sections

Dec 4, 2017 Shaun

This morning, in bright sunshine but chilly air, we finished installed the last two middle rafters on the “H” section of the roof. Then we spent the rest of the…

Build Progress Phase 4 Rafters

“L” Now Complete, “P” Middle Section Done and Half of “H” Finished

Dec 2, 2017 Shaun

Today, in a quiet and chilly but with lovely sunshine, we got most of our rafters we had manufactured up and installed into the roof  structure. The “L” section is…

Posts pagination

1 … 52 53 54 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed