The sewage pipeline from the garage to the manhole connection point just next to the sewage treatment unit is now laid and gravel placed around it to bed it in. We await for the building control inspector to come and err.. inspect! He should be back from his hols on Monday.
While we wait, we will look at the utility trench on the left side of the garage and check the list of conduits and pipes and make sure we have everything we need!