We cut the drainage slots into our standard sewage pipes with a circular saw. We also did a trial layout of leach field.
Author: Shaun
-
Received 450 square metres of geotextile
We have today recieved two rolls of geotextile! Each is 2.25m wide by 100m long! These are bargin purchases because they are “seconds”. We plan to use them as liners in the leach field and as a separator under the temporary hardstanding!
Very Heavy Indeed!

