Skip to content
Roselea
About
Contact Us
Design
Electricity
Energy
Solar Electricity
Solar Thermal
First Floor
Garage
Ground Floor
Ground Works
Roof
Site
Ventilation
Walls
Water
Rain Water
Sewage
Find Us
Pictures
Material Samples
Temporary Building
Plans
Structural Engineer Apr 2013
Groundworks September 2010
Building control May 2010
Planning April 10
Planning October 09
Planning August 2009
Tasks
Webcam Feed
FTH 14 Sept – L Compacted
Written by
Stephen
in
←
Progress over the last week
Comments
Leave a Reply
Cancel reply
You must be
logged in
to post a comment.
More posts
Plumbed in the Hot Water Tank and the Pump into Hot Water System
17 May 2025
Created a Sheet Material Hoist for Upper Level
12 May 2025
Hot Water Tested
30 March 2025
Installing Air Ducts Underneath Utility Room and the Hallways
29 March 2025
Leave a Reply
You must be logged in to post a comment.