Skip to content
  • Fri. Aug 15th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Phase 3 Swimming Lane

Concrete End Cap Poured

Mar 31, 2016 Shaun

Today, we sealed the end of the gap between the swimming lane’s back wall and the fence, by pouring in concrete into a mould. This End Cap was necessary because…

Build Progress Phase 3 Swimming Lane

Sixth Row is Complete!

Mar 30, 2016 Shaun

The back wall is now completed with the 6th row of blocks laid today. we had to do another 31 blocks to finish it off and 1 around the corner…

Build Progress Phase 3 Swimming Lane

The Shored Up Soil is Released

Mar 29, 2016 Shaun

Today, after a couple of weeks delay while we waited for the concrete in the back “retaining” wall, to cure and gain proficient strength, we released the shored up soil…

Build Progress Phase 3 Swimming Lane

The Tubes are all done!

Mar 14, 2016 Shaun

WOW! We finished it all today, even though we started much later at 11:30am (due to having had an appointment in the morning). We did 38 columns using 9½ bags…

Build Progress Phase 3 Swimming Lane

Another 33 Columns filled!

Mar 12, 2016 Shaun

Today, another 33 columns were filled!! We decided that it would make sense to split the mixing load in half and do only a half a bag of cement and…

Build Progress Phase 3 Swimming Lane

31 Columns Filled in Back Wall

Mar 11, 2016 Shaun

Today, we managed to fill a further 31 hollow columns in our retaining back wall. This is 8 bags of cement, mixing each bag with 6 builders bucket of ballast.…

Equipment and Tools

Concrete Vibrator

Mar 10, 2016 Shaun

We use for the first time, our new tool! It is a vibrator to help settle the concrete down and knock out any pockets of air. It is very noisy…

Build Progress Concrete Phase 3 Swimming Lane

Concrete Filling Begins on Back Wall

Mar 10, 2016 Shaun

This afternoon, we began the task of filling up 101 hollow columns in the back wall of the retaining wall of the swimming lane. We got things organised and place…

Accidents Equipment and Tools

Mini Trolley Met Big Bad Truck!

Mar 10, 2016 Shaun

OOPS! The dumper truck has just ran over our poor little platform trolley! We were reversing the truck to gain room and straighten up, in order to move the load…

Build Progress Equipment and Tools Phase 3

Platform and Ramp

Mar 10, 2016 Shaun

The platform and Ramp is now ready for helping us get the concrete into the “hollow tubes” in the wall. The ramp is 12 feet long as we found that…

Posts pagination

1 … 103 104 105 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed