Final Stage of Building the Ker Around Skylight Continues
Today, we carried on with the last stage of putting together the Kerb Framework around the Skylight. We Came along the long side of the Skylight (nearer side to the…
A DIY Selfbuild by Stephen, Shaun & Daphne
Today, we carried on with the last stage of putting together the Kerb Framework around the Skylight. We Came along the long side of the Skylight (nearer side to the…
We carried on with building up the Kerb Framework around the Skylight today, finishing off putting on the top planks of timber, the 89mm CLS pieces around on the narrower…
This morning, we sliced up the LVL timber while we waited for the overnight rain to dry off the woodwork. The Laminated Veneer Lumber arrived as 220mm wide long planks…
Today, we worked on the Kerb framework of the Skylight, starting early at 9am and worked until 4pm when the rain (as predicted) came in quite hard. We got a…
Then this afternoon, while the rain came sprinkling down, we were in the workshop slicing up lots and lots of polystyrene foam boards into narrow strips of various thickness, in…
This morning we put together the 3D printed plastic sweep bend and connected it to a length of 38mm diameter black pipe going up the middle of the chimney support…
Today, we went around with two tubs of short timber pieces, one full of simple 63mm CLS timber pieces and the other full of glued together T shaped timber pieces.…
First thing this morning, the steel Support Arm for the Chimney was painted with its second layer of the black metal weather proof paint again, outside on the step ladder.…
And finally, we created a simple alignment tool to help us when we come to install the little pieces of timber for the Skylight framework module. We needed something to…
This morning, we ground, rubbed, and cleaned up the steelwork of our new Support Arm for holding up the Chimney on top of our Roof. We then took it outside…