Shuttering Boards Cut and Started Next Section
This afternoon, we sliced up 6 sheets of the 18mm OSB boards to make a collection of 2 different heights of shuttering. We made 12 pieces of 200mm tall and 16…
A DIY Selfbuild by Stephen, Shaun & Daphne
This afternoon, we sliced up 6 sheets of the 18mm OSB boards to make a collection of 2 different heights of shuttering. We made 12 pieces of 200mm tall and 16…
Today, we finished off the shuttering for the back section of the building’s foundations. We put the two layers of the 89mm Timber to form the necessary height to hold…
We started the repair process on Energy Module number 4 (the entertainment room – also the smallest module) by emptying the water out and putting it into our other modules.…
We resumed the work on the construction of the foundation trenches shuttering along the back section of the building. The ground in several places is very hard and one place…
We finished off doing our flood preventive measures this morning, by putting more sand along the Loke boundary to block off several point of access for the rain water gushing…
We resumed our work after our little holiday by constructing a berm to stop the rain water that flows down the Loke from entering our driveway and our house etc.…
We had another very heavy thunderstorm that dropped nearly an inch of rain in a matter of minutes (about 15 minutes in all)!! The protection we have installed to stop…
We started on the long job of constructing the Edge Strips for the Foundation Trenches. We went from the back right hand corner and went along the back section, running parallel…
This morning saw quite a lot of rain come down and we didn’t fancy working out there in the wet stuff! But it looks like it has cleared up for…
we are having a little break to recharge our batteries and do other things for the next week.