I-Beams Arrive!
In the morning we prepared an area to store the beams next to the house. The lorry arrived at 1:25pm with the 66 special I-Beams on a open flatbed vehicle,…
A DIY Selfbuild by Stephen, Shaun & Daphne
In the morning we prepared an area to store the beams next to the house. The lorry arrived at 1:25pm with the 66 special I-Beams on a open flatbed vehicle,…
Monday is the big day with the arrival of 66 special timber I-Beams, the last three days have been spent preparing for this happy day. So, we adapted our large…
The other piece of equipment we made while we waited for this day, was to build a special chop saw table to cope with slicing these I-Beams. Their physical size,…
At the beginning of the three weeks waiting for the arrival of our First Floor Joists, we sat down to analyse all requirements of providing connections to the outside world…
Our Glass Wool insulation we ordered last week has arrived today. The delivery truck parked in our local Tesco Express (after asking the staff inside the shop for permissions) and…
We continued the task of putting up reinforced wall posts for the hanging toilets for the cloakroom and for the en-suite of Bedroom 3 where we had to put down…
After a week of calculating, analysing responses and digesting options, we have finally placed an order for a collection of Joist Beams to build our First Floor support. There are…
We have resumed our task of building up the Ground Floor’s walls, at least, the structural framework structure using our 63mm CLS timber planks and over the last eight days…
Whilst tidying up the house of the insulation foam rubbish, a new set of shelves was created to provide more room for tools and parts to be on hand for…
In the course of filling our exterior walls with rigid foam boards, which get a huge “mountain” of left-over cut-offs pieces, some fairly regular in shape but many just simply…