Skip to content
  • Tue. Jul 8th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Delivery Phase 5

Second Delivery of CLS Timber Arrives

Nov 27, 2020 Shaun

Our remaining timber arrived Thursday yesterday late afternoon. There were 348 planks in this second delivery, adding with our previous one of 99, we now have 447 planks of 63mm…

Phase 5 Site Management

Tidy Up and Replace Lighting Units Plus Installed New Camera System

Nov 26, 2020 Shaun

After skipping the first day of the new week because of some appointments, the next three days we went around tidying up the house after we had finished the Entertainment…

Build Progress Entertainment Room Phase 5 Timelapse Movies

Concrete Beams and Blocks Forms the Lid for the Entertainment Room

Nov 21, 2020 Shaun

This week it is the turn of the Concrete Beams and hundreds more of the concrete blocks to be hoisted up and laid out to form the roof of the…

Delivery Phase 5

Untreated 63mm by 38mm CLS timber Arrives

Nov 20, 2020 Shaun

We had our delivery of fresh timber arrive today, this morning, but it turned out to be only fraction of what we ordered. There was some confusion back in the…

Build Progress Entertainment Room Phase 5

Concrete Shell Almost Finished

Nov 14, 2020 Shaun

Monday, we did two and half layers in building up our wall inside the Entertainment Room, that is over seventy blocks! We completed layer 4, then number 5 and number…

Build Progress Entertainment Room Phase 5

Concrete Wall Grows Taller

Nov 7, 2020 Shaun

For this new week, we started the task of building the concrete shell that will sound proof our Entertainment Room. The first task was to make a template to help…

Build Progress Delivery Entertainment Room Phase 5

Ten Concrete Beams Arrives

Nov 4, 2020 Shaun

Suddenly at a bright early hour, our concrete beams, all ten of them, arrive! We had to parked them on our driveway in such a position so we could then…

Equipment and Tools Phase 5

Jig to Slice Concrete Blocks

Nov 3, 2020 Shaun

This morning, we created a jig to help us slice up concrete blocks using our large mains powered angle grinder fitted with a diamond coated cutting blade. We put several…

Build Progress Delivery Entertainment Room Phase 5

Concrete Blocks Arrives

Nov 2, 2020 Shaun

The first load of new building material arrived today. 576 dense concrete blocks arrived with a ton bag of soft sand, eight bags of cement, two large paving slabs and…

Build Progress Entertainment Room Phase 5

Stud Wall Built and Covered in Fermacell Boards

Oct 31, 2020 Shaun

This week, we started on building our timber Stud Wall that surrounds the concrete shell that encloses the Entertainment Room. But before that, we created another piece of equipment down…

Posts pagination

1 … 19 20 21 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed