Skip to content
  • Fri. Jan 16th, 2026

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Concrete Groundworks Phase 3 Timelapse Movies

Floor Slab is Poured!

Oct 10, 2016 Shaun

 What A Day! 7 AM We started at 7am at the crack of dawn to clear away as much as possible the rain water still puddling on the DPM plastic…

Groundworks Phase 3 Rain

Rain, Rain, Rain – Before Floor Slab is Poured!

Oct 9, 2016 Shaun

 We woke up to the news that we had well over 10mm of rain overnight, plus the 5mm we had the day before and thus making 15mm of rain! Oh…

Build Progress Groundworks Phase 3 Rainwater

Day 2 of Installing the Pipework for Rainwater off Roof

Oct 7, 2016 Shaun

 This afternoon, we continued with installing of the pipework running around the perimeter of the house, connecting to the downpipes from the roof and the guttering. We went along the…

Build Progress Groundworks Phase 3 Rainwater

Installing Pipework for Rainwater off the Roof and Guttering

Oct 6, 2016 Shaun

 Today, while we are waiting for the arrival of the ready mixed concrete on Monday, we carried on with the preparation and installation of the pipework running around the perimeter…

Repair Swimming Lane Timber

Tarpaulin Covering “rots” under the Hot Summer Sun!

Oct 5, 2016 Shaun

 And finally, we had to deal with a failed covering on our Timber Store located in our Swimming Lane. The tarpaulin has been completely “fallen” apart from being blasted by…

Build Progress Groundworks Phase 3

Laser Level Check and Final Adjustments of Cellular Framework of Floor Slab

Oct 5, 2016 Shaun

 This afternoon, we went around checking the height of all our cellular framework that divides up the Floor Slab. It is rather satisfying that we didn’t get more than 10mm…

Build Progress Building Control Groundworks Phase 3

Building Inspector Approves Preparation for Floor Slab!

Oct 5, 2016 Shaun

Our Building Inspector came along at lunch time and spent a few minutes looking over our DPM plastic, sticking up pipes and how it was all stuck together. He said…

Build Progress Phase 4

Shopping List for Steel Bits and Pieces

Oct 5, 2016 Shaun

This morning, a shopping list is being made up containing the Steel parts that forms the Central Structural Framework that holds up the whole roof complex. There are RSJ, box…

Build Progress Equipment and Tools Groundworks Phase 3

Concrete Deflector for Top of Perimeter Walls

Oct 4, 2016 Shaun

 We finished off the day’s work by building a deflector to control  the sloshy concrete being poured onto the top of the Perimeter Wall. The walls has hollow columns and they are…

Build Progress Groundworks Phase 3

Day 2 of Assembly of Cells Framework in Floor Slab

Oct 4, 2016 Shaun

 We completed the Assembly of the cellular framework in the rest of the Floor Slab, namely the Entertainment Room, Bedroom 2 and then Bedroom 3 and Utility Room. We then…

Posts pagination

1 … 85 86 87 … 149

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed