Skip to content
  • Mon. Aug 11th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Equipment and Tools Groundworks Phase 3

Concrete Deflector for Top of Perimeter Walls

Oct 4, 2016 Shaun

 We finished off the day’s work by building a deflector to control  the sloshy concrete being poured onto the top of the Perimeter Wall. The walls has hollow columns and they are…

Build Progress Groundworks Phase 3

Day 2 of Assembly of Cells Framework in Floor Slab

Oct 4, 2016 Shaun

 We completed the Assembly of the cellular framework in the rest of the Floor Slab, namely the Entertainment Room, Bedroom 2 and then Bedroom 3 and Utility Room. We then…

Build Progress Groundworks Phase 3

Floor Slab Cells Assembly – Day 1

Oct 3, 2016 Shaun

 Today, we started assembling the wooden dividers which go across the whole Floor Slab from the sections we made last week. We have done the Great Room and the section…

Build Progress Groundworks Phase 3

Floor Slab Dividers Cut and Ready

Oct 1, 2016 Shaun

While it was wet outside, we continued with making pieces of the cellular framework matrix that will divide up the Floor Slab into lots of rectangular regions so that no…

Build Progress Groundworks Phase 3

Day 4 of Setting in the DPM over Ground

Sep 29, 2016 Shaun

 Today, while we waited  for the rain shower to clear up, we sliced up loads of strips of OSB left-over from our foundation shuttering, down to 100mm wide, and these will…

Build Progress Groundworks Phase 3

Day 3 – DPM All Down and Ready for Floor Slab .. Almost!

Sep 28, 2016 Shaun

Today, we finished off laying down the plastic sheeting over the ground. We completed the strip over the Entertainment Room and Bedroom 2 which was fairly difficult with the array…

Build Progress Groundworks Phase 3

Day 2 of Laying DPM down for Floor Slab

Sep 27, 2016 Shaun

 We carried on with the task of laying the Damp Proof Membrane (DPM) plastic down on the ground inside our perimeter wall of our house. We now have completed and…

Build Progress Groundworks Phase 3

Continuing with DPM and Final Levelling of Ground

Sep 26, 2016 Shaun

 With an interrupted morning, we carried on with the laying out of the DPM plastic sheeting across the whole ground area of the building. We covered up the Great Room…

Build Progress Groundworks Phase 3

Checking Items off List Before the Floor Slab is Poured

Sep 24, 2016 Shaun

 Today, we carried on with the preparation jobs to be done before the concrete Floor Slab is poured. We made a list of all the tasks that has to be…

Build Progress Groundworks Phase 3 Utilities

Organised The Utility Conduits and Pipes

Sep 23, 2016 Shaun

 Today, we tackled the task of digging and loosening all the various pipes and conduits that run from the Garage to the House, and get them all laid out to come up…

Posts pagination

1 … 85 86 87 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed