Skip to content
  • Tue. Aug 12th, 2025

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed
Build Progress Energy Modules Groundworks Phase 3

All 5 Modules Now In Place!

Jul 5, 2016 Shaun

 At Long Last, we have finished all 5 energy modules, all buried in the ground and all full of water. The only signs of their presence is the red white…

Build Progress Energy Modules Groundworks Phase 3

Day 8 of the Great Module Number 5 – All Done At Last!

Jul 5, 2016 Shaun

 This morning, we finished off burying the last of our Energy Modules, Number 5, with sandy soil and covering it up too. The warning red/white hazard tape was wrapped around the…

Build Progress Energy Modules Groundworks Phase 3

Day 7 of the Great Module Number 5 – Finishing Touches and Filling Almost Complete

Jul 4, 2016 Shaun

 Today, we finished off the installation of the insulation panels on top of our Energy Module Number 5. At the same time, we started pumping water into the module, we…

Build Progress Energy Modules Groundworks Phase 3

Day 6 of the Great Module Number 5 – Assembly Finishes ..

Jul 2, 2016 Shaun

 In a rain interrupted day of work, we finished assembling the Aquacell crates for Energy Module Number 5. Next we put down a plastic sheet to cover the top surface and…

Build Progress Energy Modules Groundworks Phase 3

Day 5 of the Great Module Number 5 – Assembly Starts..

Jul 1, 2016 Shaun

 We continued with Energy Module Number 5 with the start of the assembly of the actual module itself at last! But first, not forgetting this time, we put in the…

Build Progress Energy Modules Groundworks Phase 3

Day 4 of the Great Module Number 5 – All Dug, Levelled and Smoothed!

Jun 30, 2016 Shaun

 Today, under the glorious hot sun, we finished digging out the hole, for Energy Module Number 5. We then started on the smoothing and leveling process, with the insertion of…

Build Progress Energy Modules Groundworks Phase 3

Day 3 of the Great Module Number 5 – The Big Dig!

Jun 29, 2016 Shaun

 Today, we started the major task of digging out the hole to receive our largest Energy Module we are assembling underneath our house. But first, we tidied up various bits…

Build Progress Energy Modules Phase 3

The Great Aquacell Cleanup for Module Number 5 – Day 2!

Jun 28, 2016 Shaun

 It is day 2 (and last day!) of our cleanup operation of the remaining Aquacell crates we have had in storage ever since we bought them several years ago! The…

Build Progress Energy Modules Phase 3

The Great Aquacell Cleanup for Module Number 5 – Day 1!

Jun 27, 2016 Shaun

 We started the huge task of cleaning all the remaining 90 Aquacell crates to get them ready for our biggest underground Energy Module, Number 5. It measures nine metres  long…

Build Progress Energy Modules Groundworks Phase 3

Module Number 3 Is Filling Up!

Jun 26, 2016 Shaun

 Today, we carried on with the filling operation for our Energy Module Number 3. We had pulled most of the water out of the swimming lane and the meter reported…

Posts pagination

1 … 93 94 95 … 148

Roselea

A DIY Selfbuild by Stephen, Shaun & Daphne

Proudly powered by WordPress | Theme: Newsup by Themeansar.

  • Home
  • About
  • Contact Us
  • Design
    • Electricity
    • Energy
      • Solar Electricity
      • Solar Thermal
    • First Floor
    • Garage
    • Ground Floor
    • Ground Works
    • Roof
    • Site
    • Ventilation
    • Walls
    • Water
      • Rain Water
      • Sewage
  • Find Us
  • Pictures
    • Material Samples
    • Temporary Building
  • Plans
    • Structural Engineer Apr 2013
    • Groundworks September 2010
    • Building control May 2010
    • Planning April 10
    • Planning October 09
    • Planning August 2009
  • Tasks
  • Webcam Feed