Final Flood Preventive Measures in Place
We finished off doing our flood preventive measures this morning, by putting more sand along the Loke boundary to block off several point of access for the rain water gushing…
A DIY Selfbuild by Stephen, Shaun & Daphne
We finished off doing our flood preventive measures this morning, by putting more sand along the Loke boundary to block off several point of access for the rain water gushing…
We resumed our work after our little holiday by constructing a berm to stop the rain water that flows down the Loke from entering our driveway and our house etc.…
We had another very heavy thunderstorm that dropped nearly an inch of rain in a matter of minutes (about 15 minutes in all)!! The protection we have installed to stop…
We started on the long job of constructing the Edge Strips for the Foundation Trenches. We went from the back right hand corner and went along the back section, running parallel…
This morning saw quite a lot of rain come down and we didn’t fancy working out there in the wet stuff! But it looks like it has cleared up for…
we are having a little break to recharge our batteries and do other things for the next week.
Today, we finished off chopping and slicing points on about a hundred pegs, carried over from yesterday. They are short 500 mm long pieces using spare 63mm by 38mm timbers…
Skipping lunch, we put back the batter board, L2, that was moved to allow the mini-digger to dig and pile up all the excess sand soil mixture from the excavation…
At Long Last, we have finished all 5 energy modules, all buried in the ground and all full of water. The only signs of their presence is the red white…
This morning, we finished off burying the last of our Energy Modules, Number 5, with sandy soil and covering it up too. The warning red/white hazard tape was wrapped around the…