Today, we decided to move the heap of timber planks we had stored inside our Great Room, on a raised shelving rack system.

Spare timber Store Moved Outside to Swimming Lane

Timber-storage-rack


The main reason for tackling this job now, to move the timber outside, was because we needed access to our external walls to insert the insulation foam boards. We knew that we had to move this pile of various sized planks anyway, sometime in the future so we felt that if we did it now, then we would finish off the insulation task completely and not have it hanging over us.
So the first job was to have a look at our swimming lane outside, to rearrange some of the items so we had enough room for the 4.8metres long planks.

We pushed this and that bits and pieces around and was able to transport a collection of planks, ranging from 89mm by 38mm planks, some 100mm by 50mm ones and three big 100mm by 75mm planks to their new storage location, under cover in our Swimming Lane.

Spare timber Store Moved Outside to Swimming Lane

Moved-to-swimming-lane-storage


The shelving system in the Great Room was dismantled and we now got a cleared area to allow us to gain access to the walls for the installation of the insulation chunks.
The rest of the timber, the 63mm by 38mm type, is staying indoors because they will get used up to build all the internal rooms for both the ground and upper floors.
Spare timber Store Moved Outside to Swimming Lane

Tidied-the-CLS-stacks

By Shaun

Leave a Reply