This afternoon, we unloaded the 3 heavy legs and loaded the remaining 4 lighter legs onto the trolley and transferred them into the workshop. The Foot plates and Top plates were welded on and then the collection of sticking out tabs were welded half way up the legs in the appropriate positions to achieve the necessary connections between the legs (just like what we had done on the first 3 legs).

Last-4-legs-brackets-welded

Last-4-legs-brackets-welded

Last-4-legs-top-plates-welded

Last-4-legs-top-plates-welded

Last-4-legs-base-plate-welded

Last-4-legs-base-plate-welded


The final job is to paint them tomorrow and we will be all finished! Then the fun job of assembly will begin …. wish us luck!!

By Shaun

Leave a Reply