Back Wall Has Started
Date:21/02/2016 18:33 We started building the back wall of the swimming lane today! We managed to do 43 blocks with 3 mixer loads of mortar before it got dark. Each…
A DIY Selfbuild by Stephen, Shaun & Daphne
Date:21/02/2016 18:33 We started building the back wall of the swimming lane today! We managed to do 43 blocks with 3 mixer loads of mortar before it got dark. Each…
We moved all the 120 concrete blocks over to the slab, spread out along the whole length (22.5metres), ready to build up 2 layers of the back wall, and the…
We also removed the shuttering framework that was wrapping around the foundation slab. The 89mm CLS timber, all 10 lengths of them, are now piled up on the side, ready…
Three pallets of concrete (215mm x 215mm x 440mm ) blocks, a pallet of Blue Circle cement bags and a ton of soft sand arrives today. It is our first…
After two days of rest to recover from the hectic episode of getting the ready-mixed concrete in, we today, went out to cut slots in the slab to “guide” cracks…
Our ready mixed concrete duly arrived this morning, 8am sharp! We managed to get our little extension chute installed on the dumper truck in time and park it over by…
The framework for holding the reinforcing bars in the correct positions, has been constructed using our pile of 63mm CLS timber. We drove in pegs and posts to hold the…
We have ordered 4 cubic metres of ready mixed concrete for Monday 8am! The price has gone up since 5 years ago and now is £425 for this load!! Yes,…
Today, we started on the job of slicing up 55 6metres steel bars into 105 lengths of 2metres, and 100 lengths of 1metre. Then all were bent right angles, so…
We have finished constructing the foundation trench framework. We put in about 8 tons of crushed builders rubble (maximum 75mm / 3inch size) and then blinded the surface with clean…