Day 3 – Tuesday 31st August

Finished laying the pipes in the trench.

shows all the pipes in place

Now we have to cover them in fill (sand/soil) to the level of the bottom of the rainwater tank & soak-away. The boards down the length allows us to drive the Kanga Kid around collecting and dumping fill. We dumped fill over the edge in the corner of the trench and moved as necessary. By the end of the day we have placed half of the fill.

pipes covered in fill.

By Stephen

Leave a Reply