All of the area around the foundations has now been filled to nearly the right level. The area inside the garage was filled with sand and compacted and the outsides filled with soil.

We are now ready for concreting after we place the final formwork for the pad under the central pillar between the doors.

Filled to base of slab (nearly)

By Stephen

Leave a Reply