we sorted out the electrics to allow us to nail up the plaster boards. Currently the electric cable comes in from under the floor into the old storage shed and soon this will be replaced but not right now! We levelled out the floor with 11mm sheet of OSB down the sides and it is now ready for the 50mm thick Polystyrene foam boards.

We had a little fire in the incinerator to get rid of odds and ends which were accumulating in a corner of the storage shed!

Shed empty ready for bedrooms

Shed empty ready for bedrooms


Shed empty ready for bedrooms

Shed empty ready for bedrooms

Now we can start putting up the plaster boards and building the air conduits and finally the partition walls!

By Shaun

Leave a Reply