Today, we shovelled loads of soil and rubble back over to behind the new
Back Wall of the swimming lane. Much of this dirt was the same material that
had collapsed and washed down away from that higher grounds during the
thunderstorm we had back in January.

Blocks-Stacked-at-End-of-Lane

Blocks-Stacked-at-End-of-Lane

Filled-behind-wall-at-Workshops

Filled-behind-wall-at-Workshops


It is all rather neat now and once it is settled down a bit, we can put back
the old fence too.

We also put together a solid blockage using excess concrete blocks and the
extra length of the DPM plastic sheet to seal off the open end of the
swimming lane to stop any further rain water and mud from sliding down into
the lane. Or at least we hope so!!

By Shaun

Leave a Reply