Today, we carried on with the tidying up task of removing the batter boards, disassembling the unused concrete shoots, collecting up all the rubbish and any other miscellaneous items left lying around the area inside the boundary of the house.

Site-cleared

Site-cleared

Then, we started scraping and leveling the surface in the Entertainment Room and the Utility Room alongside it, by using a four metre long timber piece, supported by the concrete foundation strips down each side, to drag the soil away and leave a leveled surface.

Entertainment-room-leveled

Entertainment-room-leveled

2016-09-15

2016-09-15


Tomorrow, a short day (just a couple of hours in the morning), we will bring up the level in the Utility Room using the soil in the trolley and then empty the rest from the trolley, by dumping it over the Perimeter Wall somewhere, before our appointment in the afternoon and predicted rain too!

By Shaun